At Solid Bridge Construction, we are dedicated to excellence in heavy civil construction. Our commitment to personalized service ensures that every infrastructure project—from highways to bridges, riverbanks to dams—receives focused, expert oversight. A dedicated project manager is assigned to each project, managing it from initial design through to completion. Our project managers can devote the attention required to ensure rapid adjustments and streamlined communication, minimizing delays and maximizing efficiency.

We offer not only general contracting, but also complete project management services tailored for large-scale infrastructure projects. Our pre-construction services include rigorous analysis of engineering methods, cost-benefit evaluations, and strategic budget planning to meet the challenges of complex builds.

Fort Worth Bio Solids Facility

  • Relocated the Trinity River 180 linear feet to protect the Bio-Solids Facility
  • Installed 40,000 tons of rock rip-rap
  • Installed bio-engineered coir lifts
  • Installed 6,000 plus tress and shrubs with irrigation for site restoration

Brazos River Stabilization

  • Executed a successful emergency stream bank stabilization of the Brazos River
  • Added 68,000 tons of rip rap and one mile of bank stabilization
  • Preserved a historical Texas battle site within construction
    boundaries.
  • Completed the entire project in 180 days, with work substantially completed in 105 days.

Cypress Park Detention HCFCD​

  • 160,000 yards of detention basin excavation
  • Coffer dam
  • Asphalt road
  • 48-in supplementary outfall pipe(s) and electronic control system to Cypress Creek

City of Brenham Hurricane Harvey GLO

  • 7 site locations
  • TxDot Bridge
  • Stream Restoration with Rock Rip-Rap and Slope Paving
  • Large Bore RCP Storm Sewer through downtown Brenham

Third Garland Creek Stabilization

  • Sheet Piling
  • Sewerline Protection
  • Erosion Control

Trinity River Emergency Erosion Repairs

  • MSE soil stabilization bags with bare root saplings and native grass germination
  • Temporary irrigation
  • Deep riverine environment
  • 38,000 tons of stone rip-rap
  • Planting of 5,586 bare root saplings
  • Planting of native grasses by means of hydroseed

Vision Park Pond Expansion Phase 2

  • 2 Contech Bridge Systems with pier and abutments
  • Redi-Rock Retaining Wall System
  • Heavy dewatering and care of water
  • Concrete slope paving and sidewalk
  • Landscape package

Brazos County Bridge Scour Repair

  • Roadway Stabilization
  • Rip-rap
  • Erosion Control
  • Guard Rail

Project Gallery

Trinity River Emergency Erosion Repairs
Brazos River Stabilization
Third Garland Creek Stabilization
Artavia Astaire Parkway Culvert Bridge
Brazos River Stabilization

Contact Us

(936) 435-0700

Send message

office@solidbridgeconstruction.com